1. TOP
  2. Portfolio
  3. T-6 Komaki II

T-6 Komaki II

  • Aichi
  • over 10,000㎡ Less than 30,000㎡
  • Single
Location 548-1, Kakinokijima, Nishinoshima Komaki, Aichi
Site Area 9,740.44 m2
Total leasable area 10,708.41 m2
Structure/Floors Steel-frame structure, alloyplated steel sheet roof, 2-story building, and other
Completed March 27, 1992
Acquisition Date Oct. 10, 2008
Acquisition Price 1,800 million yen
No. of Tenants 1
Major Tenants Arata Corporation

Income(Loss) from Real Estate Leasing Business

(million yen)

The 20th Period The 21th Period The 22th Period The 23th Period The 24th Period
Real estate leasing business revenue 非開示* 非開示* 非開示* 非開示* 非開示*
Real estate leasing business expenses 非開示* 非開示* 非開示* 非開示* 非開示*
NOI 49 49 49 49 49
Depreciation 17 17 17 17 17
Loss on Write-offs of noncurrect assets 0 -
Income(loss) from real estate leasing business 32 32 31 32 32
CAPEX 1 -
Book Value 1,812 1,795 1,778 1,760 1,743
Appraisal Value 1,700 1,740 1,510 1,530 1,570
* Not disclosed, for unable to obtain the tenant’s consent.

Location Profile

The site serves as a node for the area and features excellent access to expressways and major gateways, situated approximately 1km from the Komaki Interchange on both the Tomei Expressway and the Meishin Expressway. As such, the area is attracting attention as a central logistics base that can provide coverage of the entire Chubu region.
The property is situated in an area well-suited to consumer logistics operations, due to its location within 15km of Nagoya, a major commercial hub serving the entire Chubu region. Due to its proximity to the production bases of many major manufacturers, the facility can also expect to benefit from manufacturing logistics demand. The residential area near the site also provides comparatively ready availability of local labor resources, and the site is thus well-suited as a location for logistics operations.

Facility Profile

The property is equipped with specifications wellsuited to a distribution-type logistics facility, including uncommonly ample space for the flow of cargo in a two-story steel-frame structure, effective column spacing from 10.0m to 18.0m, a standard ceiling height of 4.0m and a floor load on the first floor that enables the use of forklifts and other heavy equipment.
The facility is also equipped with one-sided berths that can accommodate 20 trucks as well as two elevators, enabling the rapid handling of incoming and outgoing cargo and smooth workflow within the warehouse. Additionally, the property also houses an office section, company dormitory and rest facilities.

Press Release

MAP

Back to Top